1 | Hot Air Burner (2018) | Cargill Palm Products Sdn.Bhd. | 1,026, 928.00 | 3.0 months |
2 | Natural Gas Infrastructure Conversion (2018) | Pure Circle Sdn.Bhd. | 730,500.00 | 3.0 months |
3 | To conduct insulation (2018) | Dutch Lady Milk Industries Berhad | 386, 900.00 | 2.0 months |
4 | 48M3/ hr Thermal Deaerator (2018) | Evyap Sabun Malaysia Sdn.Bhd. | 340,000.00 | 1.3 months |
5 | Upgrade Burner Control System (2018) | IOI Pan-Century Oleochemicals Sdn. Bhd | 119 500.00 | 2.0 months |
6 | Change New Burner (2018) | Venator Asia Sdn.Bhd. | 185,500.00 | 2.5 months |
7 | PMT 91358 Processing Vessel Body Repair Work (2019) | Dutch Lady Milk Industries Berhad | 150,000.00 | 2.0 months |
8 | New S/S Platform C/W Staircase (2018) | Dutch Lady Milk Industries Berhad | 146,280.00 | 1.5 months |
9 | Install New Burner (2019) | Mackenzie Industries Sdn. Bhd. | 117,932.00 | 2.0 months |
10 | New Boiler Control Panel (2018) | Sime Darby Kempas Sdn.Bhd. | 117,650.00 | 2.0 months |
11 | Supply TOH Coils & Front Cover (2018) | San Miguel Yamamura Packaging | 168, 010.00 | 1.5 months |
12 | Fabricate New Control Panel To Fabricate New Control Panel For One Unit Steam Boiler (2018) | Bremfield Sdn. Bhd | 123,692.46 | 1.5 months |
13 | Mobrey Modulating Valve Boiler No 1 (2019) | Star Feedmills (M) Sdn Bhd | 20,000.00 | 3 weeks |
14 | To Supply Labour, Tools and transportation to carry out combustion tuning medium pressure steam boiler (2019) | Sime Darby Plantation Berhad | 9,200.00 | 1 week |
15 | Servicing Condenser ERF L#1 (2019) | Pure Circle Sdn Bhd | 40,500.00 | 2 week |
16 | Supply Manpower, Tools And Consumables at SD Chamber, Cyclone, Bag Filter And Fluid Bed Dryer (2019) | Pure Circle Sdn Bhd | 14,800.00 | 2 week |
17 | Modify and Reroute Condensate Pipe At Technical Area Line 1 (2019) | Pure Circle Sdn Bhd | 37,500.00 | 3 weeks |
18 | Replacement Of Chimney Ducting-Plate 6.0 (2019 ) | Linatex Rubber Sdn Bhd | 12,800.00 | 1 week |
19 | To Provide Labour, Tools And Transportation To Carry Out Overhaul Of Boiler No1 (2019 ) | Kerry Ingredients (M) Sdn Bhd | 12,765.00 | 1 week |
20 | To Supply & Install Air Diverter Plate And Replace Spiral Agitator For Boiler No1 ( 2019 ) | Pure Circle Sdn Bhd | 33,560.00 | 2 weeks |
21 | Auto Flame Mini8 Evolution Module MMM8002 (2019) | PT Global Energi Sumatera | 25,560.00 | 3 weeks |
22 | To Modify Tank C And Piping Job (2019) | Dutch Lady Milk Industries Berhad | 20,800.00 | 1 week |
23 | To Conduct Boiler Overhaul For Jkkp Inspection For 2019 | KL-Kepong Oleomas Sdn Bhd | 24,000.00 | 2 weeks |
24 | Steam Piping From Existing Steam Pipe To New Plant- 50meter(2019) | H & R Wax Malaysia Sdn Bhd | 16,800.00 | 2 weeks |
25 | Supply Manpower, Tools, equipment, material And Transportation To Replace Existing deaerator System Mechmar 2 at (2019) | Felda Iffco Sdn Bhd | 110,000.00 | 3 weeks |
26 | Fire Fighting Tank ( Beta Tank) 6” Float Valve With S/S 304 10K Flange End Including Insulation | Dutch Lady Milk Industries Berhad | 12,300.00 | 1 week |
27 | Boiler House Dearator Control System To Supply Labour, Tools Consumables, Materials and Equipment | Bremfield Sdn Bhd | 41,800.00 | 1 week |
28 | Labour Charges Transport Changes at Kustiya to Dhaka (2019) | Euratec Engineering Sdn Bhd | 14,356.11 | 2 weeks |
29 | Lacour Charges For Servicing Boiler at Puma Energy Myamar ( 2019 ) | Euratec Engineering Sdn Bhd | 8,113.03 | 2 weeks |
30 | To Suply Labour, Tools To Commissiong One Unit Bio Gas Burner at Bangkok ( 2019 ) | Euratec Engineering Sdn Bhd | 6,000.00 | 2 week |
31 | To Supply Site Supervior During Burner Installation at Venator ( 2019 ) | Euratec Engineering Sdn Bhd | 11,700.00 | 1 week |
32 | To Supply Commissioning Engineering For Commissioning One Unit Of Saacke Burner at Venator | Euratec Engineering Sdn Bhd | 14,300.00 | 2 weeks |
33 | Feed Water Pump Starter Type: SD Auto/Manual Selctor Switch And Run/Trip | Mackenzie Industries Sdn Bhd | 31,200.00 | 2 week |